Power use by the Washington/Oregon data center cluster was almost entirely covered by a local surplus of hydropower until a couple years ago. That might be why it looks different from elsewhere.
If you’re doing a massive load increase, build out emissions-free generation to match. Some mix of wind, solar, batteries, nuclear, and geothermal would do fine. Otherwise, don’t do the big load increase.
The environmental movement asked the same thing for subsidized hydrogen production